Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2383.53 ft | 2375.53 | 2381.53 | 2382.53 | 2333.20ft | 473.865 | 32.47% | 2384.10ft | 1144.042 | 20.02 | 11.15 | 0.00 | 11.15 | 2.20 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 163.00 | 161.50 | 162.00 | 162.50 | 146.02 | 428.420 | 42.09% | 162.17 | 821.145 | 29.42 | 14.26 | 0.00 | 14.26 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 975.75 | 973.75 | 974.75 | 975.25 | 958.50 | 169.900 | 38.05% | 975.44 | 349.960 | 14.68 | 12.83 | 0.00 | 12.83 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 774.00 | 772.50 | 773.00 | 773.50 | 768.35 | 117.150 | 58.28% | 773.60 | 176.350 | 16.20 | 0.00 | 0.00 | 0.00 | 3.00 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2636.00ft | 85.093 | 57.08% | 2659.40 | 138.991 | 20.08 | 13.33 | 0.00 | 13.33 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1588.05 | 27.440 | 50.10% | 1597.25 | 48.065 | 1.16 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1196.68 | 12.9486 | 25.99% | 1203.39 | 33.935 | 0.80 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 699.40 | 29.1495 | 61.50% | 706.75 | 44.684 | 3.20 | 4.12 | 0.00 | 4.12 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 751.82 | 19.430 | 57.18% | 756.03 | 28.95 | 11.64 | 13.06 | 0.00 | 13.06 | 4.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 964.30 | 0.85 | 2.73% | 983.40 | 25.44 | 7.51 | 0.00 | 0.00 | 0.00 | 2.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 420.95 | 22.13 | 73.04% | 418.20 | 15.530 | 21.70 | 0.00 | 0.00 | 0.00 | 0.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1754.10 | 4.550 | 59.48% | 1758.15 | 7.005 | 0.29 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.20 | 3.811 | 59.27% | 456.10 | 6.156 | 17.05 | 16.76 | 0.00 | 16.76 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.90 | 0.8977 | 16.96% | 749.30 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 250.00 | 3.290 | 72.31% | 253.00 | 4.550 | 38.02 | 33.06 | 0.00 | 33.06 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 184.80 | 0.254 | 21.90% | 187.15 | 0.482 | 10.35 | 9.98 | 0.00 | 9.98 | 3.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.20 | 0.1917 | 25.12% | 821.30 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.75 | 0.177 | 45.38% | 846.90 | 0.213 | 8.91 | 8.91 | 0.00 | 8.91 | 0.00 |