Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2386.81 ft | 2378.81 | 2384.81 | 2385.81 | 2329.28ft | 431.989 | 29.60% | 2385.68ft | 1170.206 | 18.29 | 39.06 | 0.00 | 39.06 | 66.60 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 163.50 | 162.00 | 162.50 | 163.00 | 145.30 | 413.300 | 40.61% | 163.99 | 873.213 | 10.97 | 22.53 | 0.00 | 22.53 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 976.00 | 974.00 | 975.00 | 975.50 | 955.71 | 148.180 | 33.19% | 976.37 | 363.070 | 3.46 | 14.68 | 0.00 | 14.68 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 774.50 | 773.00 | 773.50 | 774.00 | 768.85 | 122.550 | 60.97% | 774.40 | 185.950 | 4.63 | 0.00 | 0.00 | 0.00 | 0.00 | Tunnel Outflow – 0 MCM (0.00cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2646.60ft | 107.406 | 72.04% | 2661.80 | 145.691 | 21.19 | 8.05 | 0.00 | 8.05 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1588.75 | 28.840 | 52.66% | 1597.65 | 48.165 | 1.26 | 0.10 | 0.00 | 0.10 | 1.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1197.19 | 13.9636 | 28.02% | 1206.94 | 49.487 | 0.37 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 692.00 | 17.1306 | 36.14% | 706.95 | 45.333 | 6.93 | 10.09 | 0.00 | 10.09 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 748.00 | 12.150 | 35.76% | 756.27 | 29.56 | 1.90 | 7.84 | 0.00 | 7.84 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 963.75 | 0.41 | 1.32% | 978.20 | 16.93 | 3.18 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 415.55 | 10.36 | 34.18% | 421.40 | 23.250 | 6.19 | 11.96 | 0.00 | 11.96 | 2.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1755.65 | 5.360 | 70.07% | 1758.20 | 7.045 | 0.35 | 0.00 | 0.00 | 0.00 | 20.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 451.10 | 3.249 | 50.53% | 456.10 | 6.156 | 8.62 | 12.76 | 0.00 | 12.76 | 11.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.80 | 0.8590 | 16.23% | 748.70 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 248.40 | 2.666 | 58.59% | 253.00 | 4.550 | 15.44 | 18.15 | 0.00 | 18.15 | 18.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 188.10 | 0.580 | 50.00% | 190.80 | 0.912 | 14.24 | 10.67 | 0.00 | 10.67 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 819.90 | 0.1802 | 23.62% | 820.40 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.55 | 0.130 | 33.33% | 846.55 | 0.130 | 3.66 | 4.21 | 0.00 | 4.21 | 0.00 |