Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2386.81 ft | 2378.81 | 2384.81 | 2385.81 | 2329.14ft | 430.494 | 29.50% | 2385.78ft | 1171.861 | 20.24 | 36.08 | 0.00 | 36.08 | 2.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 163.50 | 162.00 | 162.50 | 163.00 | 145.33 | 413.930 | 40.67% | 164.12 | 876.956 | 31.24 | 23.43 | 0.00 | 23.43 | 3.60 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 976.00 | 974.00 | 975.00 | 975.50 | 955.90 | 149.600 | 33.50% | 976.45 | 364.230 | 38.55 | 22.12 | 0.00 | 22.12 | 146.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 774.50 | 773.00 | 773.50 | 774.00 | 768.85 | 122.550 | 60.97% | 774.35 | 185.550 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Tunnel Outflow – 0 MCM (0.00cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2647.10ft | 108.545 | 72.81% | 2662.10 | 146.540 | 22.45 | 9.28 | 0.00 | 9.28 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1588.85 | 29.040 | 53.02% | 1597.75 | 49.415 | 2.31 | 0.00 | 0.00 | 0.00 | 27.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1197.22 | 14.0591 | 28.21% | 1207.03 | 49.889 | 1.11 | 0.00 | 0.00 | 0.00 | 12.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 691.30 | 16.0253 | 33.81% | 706.70 | 44.522 | 2.95 | 15.74 | 0.00 | 15.74 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 748.07 | 12.250 | 36.05% | 756.12 | 29.18 | 8.30 | 7.18 | 0.00 | 7.18 | 102.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 964.70 | 1.17 | 3.76% | 978.35 | 17.16 | 17.73 | 0.00 | 0.00 | 0.00 | 133.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 415.40 | 10.11 | 33.37% | 420.70 | 21.500 | 10.46 | 13.36 | 0.00 | 13.36 | 0.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1755.85 | 5.480 | 71.63% | 1758.15 | 7.005 | 0.69 | 0.00 | 0.00 | 0.00 | 31.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.10 | 3.760 | 58.48% | 456.25 | 6.251 | 24.41 | 18.50 | 0.00 | 18.50 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.80 | 0.8590 | 16.23% | 747.60 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 248.40 | 2.666 | 58.59% | 253.00 | 4.550 | 25.47 | 25.47 | 0.00 | 25.47 | 3.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.90 | 0.456 | 39.31% | 191.00 | 0.939 | 17.84 | 16.10 | 0.00 | 16.10 | 7.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 819.90 | 0.1802 | 23.62% | 820.30 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.90 | 0.213 | 54.62% | 846.80 | 0.189 | 7.67 | 6.71 | 0.00 | 6.71 | 0.00 |