Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2395.01 ft | 2387.01 | 2393.01 | 2394.01 | 2335.44ft | 497.778 | 34.11% | 2387.32ft | 1197.350 | 86.41 | 8.30 | 0.00 | 8.30 | 39.40 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 166.00 | 164.50 | 165.00 | 165.50 | 148.84 | 489.203 | 48.06% | 165.46 | 915.548 | 40.38 | 0.00 | 0.00 | 0.00 | 0.80 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 976.60 | 974.60 | 975.60 | 976.10 | 964.68 | 223.120 | 49.97% | 976.55 | 365.680 | 36.90 | 5.65 | 0.00 | 5.65 | 11.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.00 | 773.50 | 774.00 | 774.50 | 770.55 | 141.350 | 70.32% | 774.55 | 188.150 | 9.26 | 0.00 | 0.00 | 0.00 | 0.00 | Tunnel Outflow -0.00 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2660.60ft | 142.310 | 95.45% | 2662.70 | 148.240 | 20.57 | 14.09 | 0.00 | 14.09 | 2.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1590.50 | 32.340 | 59.05% | 1596.90 | 47.190 | 2.31 | 0.00 | 0.00 | 0.00 | 1.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1198.42 | 17.8805 | 35.88% | 1207.17 | 50.611 | 1.84 | 0.00 | 0.00 | 0.00 | 2.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 699.60 | 29.4688 | 62.17% | 706.95 | 45.333 | 7.39 | 0.00 | 0.00 | 0.00 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 753.37 | 22.340 | 65.74% | 755.29 | 27.13 | 24.56 | 9.76 | 0.00 | 9.76 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 965.90 | 2.13 | 6.84% | 977.35 | 15.66 | 12.36 | 0.00 | 0.00 | 0.00 | 19.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 418.75 | 16.71 | 55.15% | 421.20 | 22.750 | 43.25 | 39.52 | 0.00 | 39.52 | 2.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.35 | 7.160 | 93.59% | 1758.10 | 6.970 | 0.46 | 0.00 | 0.00 | 0.00 | 26.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.10 | 3.760 | 58.48% | 456.10 | 6.156 | 12.87 | 21.51 | 0.00 | 21.51 | 2.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.90 | 0.8977 | 16.96% | 747.10 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 248.80 | 2.822 | 62.02% | 249.50 | 3.095 | 38.14 | 39.95 | 0.00 | 39.95 | 3.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.55 | 0.420 | 36.21% | 188.25 | 0.596 | 17.13 | 17.09 | 0.00 | 17.09 | 36.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.00 | 0.1842 | 24.14% | 820.30 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.50 | 0.118 | 30.26% | 846.75 | 0.177 | 10.23 | 10.51 | 0.00 | 10.51 | 4.00 |