Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2396.94 ft | 2388.94 | 2394.94 | 2395.94 | 2335.92ft | 502.902 | 34.46% | 2387.18ft | 1195.032 | 69.83 | 9.02 | 0.00 | 9.02 | 17.20 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 166.30 | 164.80 | 165.30 | 165.80 | 148.98 | 492.237 | 48.36% | 165.34 | 912.092 | 37.13 | 1.57 | 0.00 | 1.57 | 0.80 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 976.91 | 974.91 | 975.91 | 976.41 | 964.97 | 225.730 | 50.55% | 976.49 | 364.810 | 34.22 | 4.01 | 0.00 | 4.01 | 24.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.00 | 773.50 | 774.00 | 774.50 | 770.60 | 141.750 | 70.52% | 774.50 | 187.550 | 4.63 | 0.00 | 0.00 | 0.00 | 1.80 | Tunnel Outflow -0.00 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2660.80ft | 142.860 | 95.82% | 2662.60 | 147.950 | 21.28 | 14.92 | 0.00 | 14.92 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1590.55 | 32.440 | 59.23% | 1596.90 | 47.190 | 1.16 | 0.00 | 0.00 | 0.00 | 6.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1198.56 | 18.3264 | 36.78% | 1207.16 | 50.559 | 5.16 | 0.00 | 0.00 | 0.00 | 33.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 699.80 | 29.7881 | 62.84% | 706.95 | 45.333 | 6.80 | 0.00 | 0.00 | 0.00 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 752.70 | 21.200 | 62.39% | 754.87 | 26.06 | 6.12 | 8.24 | 0.00 | 8.24 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 965.90 | 2.13 | 6.84% | 977.05 | 15.21 | 10.45 | 0.00 | 0.00 | 0.00 | 8.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 418.50 | 16.18 | 53.40% | 421.50 | 23.500 | 35.43 | 41.65 | 0.00 | 41.65 | 0.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.50 | 7.280 | 95.16% | 1758.10 | 6.970 | 1.33 | 0.00 | 0.00 | 0.00 | 19.40 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.20 | 3.811 | 59.27% | 456.10 | 6.156 | 24.88 | 24.29 | 0.00 | 24.29 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.90 | 0.8977 | 16.96% | 747.00 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 249.40 | 3.056 | 67.16% | 248.50 | 2.705 | 47.63 | 44.92 | 0.00 | 44.92 | 2.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 185.90 | 0.355 | 30.60% | 188.90 | 0.670 | 11.93 | 15.26 | 0.00 | 15.26 | 10.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.00 | 0.1842 | 24.14% | 820.30 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.75 | 0.177 | 45.38% | 846.40 | 0.095 | 9.59 | 8.91 | 0.00 | 8.91 | 0.00 |