Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2396.94 ft | 2388.94 | 2394.94 | 2395.94 | 2336.42ft | 508.240 | 34.82% | 2386.96ft | 1191.391 | 74.76 | 11.46 | 0.00 | 11.46 | 53.60 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 166.30 | 164.80 | 165.30 | 165.80 | 149.14 | 495.844 | 48.72% | 165.23 | 908.924 | 55.17 | 13.02 | 0.00 | 13.02 | 16.80 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 976.91 | 974.91 | 975.91 | 976.41 | 965.49 | 230.410 | 51.60% | 976.42 | 363.790 | 59.62 | 5.45 | 0.00 | 5.45 | 90.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.00 | 773.50 | 774.00 | 774.50 | 770.65 | 142.350 | 70.82% | 774.50 | 187.550 | 6.94 | 0.00 | 0.00 | 0.00 | 0.00 | Tunnel Outflow -0.00 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.08 | 2659.72 | 2661.36 | 2661.00ft | 143.426 | 96.20% | 2662.50 | 147.670 | 21.47 | 14.91 | 0.00 | 14.91 | 15.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1590.65 | 32.640 | 59.59% | 1596.85 | 47.065 | 2.31 | 0.00 | 0.00 | 0.00 | 18.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1198.66 | 18.6448 | 37.42% | 1207.14 | 50.456 | 3.69 | 0.00 | 0.00 | 0.00 | 12.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 700.10 | 30.3767 | 64.09% | 706.95 | 45.333 | 9.61 | 2.80 | 0.00 | 2.80 | 3.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 752.58 | 20.950 | 61.65% | 753.92 | 23.69 | 8.36 | 11.18 | 0.00 | 11.18 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 967.15 | 3.33 | 10.69% | 976.85 | 14.91 | 27.56 | 0.00 | 0.00 | 0.00 | 93.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 418.65 | 16.50 | 54.46% | 421.45 | 23.380 | 33.14 | 29.41 | 0.00 | 29.41 | 8.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.60 | 7.355 | 96.14% | 1758.10 | 6.970 | 3.70 | 0.00 | 2.31 | 2.31 | 5.40 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.10 | 4.270 | 66.41% | 456.10 | 6.156 | 18.52 | 13.20 | 0.00 | 13.20 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.90 | 0.8977 | 16.96% | 747.00 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 249.60 | 3.134 | 68.88% | 249.00 | 2.900 | 34.94 | 34.04 | 0.00 | 34.04 | 1.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 188.75 | 0.652 | 56.21% | 186.80 | 0.446 | 16.62 | 15.00 | 0.00 | 15.00 | 32.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.00 | 0.1842 | 24.14% | 820.30 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.60 | 0.142 | 36.41% | 846.65 | 0.154 | 9.53 | 9.94 | 0.00 | 9.94 | 1.40 |