Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2398.85 ft | 2390.85 | 2396.85 | 2397.85 | 2351.06ft | 682.351 | 46.75% | 2385.40ft | 1165.571 | 90.53 | 23.43 | 0.00 | 23.43 | 14.60 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 166.80 | 165.30 | 165.80 | 166.30 | 154.61 | 622.974 | 61.21% | 162.65 | 834.825 | 35.69 | 21.27 | 0.00 | 21.27 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 978.83 | 976.83 | 977.83 | 978.33 | 972.46 | 310.480 | 69.53% | 976.55 | 365.680 | 37.37 | 22.32 | 0.00 | 22.32 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 771.90 | 156.350 | 77.79% | 772.40 | 162.550 | 0.00 | 12.15 | 0.00 | 12.15 | 0.00 | Tunnel Outflow -1.05 MCM (12.15cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2659.40ft | 138.990 | 93.23% | 2660.90 | 143.150 | 5.17 | 14.63 | 0.00 | 14.63 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1593.80 | 39.440 | 72.01% | 1597.40 | 48.440 | 2.89 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1201.48 | 27.6251 | 55.44% | 1207.28 | 51.177 | 4.42 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 706.60 | 44.1972 | 93.24% | 706.75 | 44.684 | 29.07 | 20.27 | 0.00 | 20.27 | 5.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 753.16 | 22.110 | 65.07% | 752.37 | 20.52 | 16.55 | 9.51 | 0.00 | 9.51 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 972.95 | 9.44 | 30.30% | 978.95 | 18.06 | 10.51 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 417.70 | 14.50 | 47.85% | 419.70 | 19.00 | 22.31 | 35.47 | 0.00 | 35.47 | 0.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.45 | 7.240 | 94.64% | 1758.10 | 6.970 | 3.01 | 0.00 | 3.47 | 3.47 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.90 | 4.168 | 64.82% | 455.90 | 6.029 | 35.58 | 33.52 | 0.00 | 33.52 | 2.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.50 | 1.1302 | 21.36% | 747.90 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 248.60 | 2.744 | 60.31% | 252.70 | 4.421 | 59.06 | 62.67 | 0.00 | 62.67 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.80 | 0.446 | 38.45% | 188.30 | 0.601 | 22.64 | 24.03 | 0.00 | 24.03 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.80 | 0.2030 | 26.61% | 820.80 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.65 | 0.154 | 39.49% | 846.40 | 0.095 | 7.61 | 7.89 | 0.00 | 7.89 | 0.00 |