Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2398.85 ft | 2390.85 | 2396.85 | 2397.85 | 2351.40ft | 686.530 | 47.04% | 2385.66ft | 1169.875 | 67.48 | 17.43 | 0.00 | 17.43 | 5.80 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 166.80 | 165.30 | 165.80 | 166.30 | 154.68 | 624.637 | 61.37% | 162.65 | 834.825 | 31.41 | 11.53 | 0.00 | 11.53 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 978.83 | 976.83 | 977.83 | 978.33 | 972.46 | 310.480 | 69.53% | 976.71 | 368.000 | 28.89 | 28.89 | 0.00 | 28.89 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 771.80 | 155.550 | 77.39% | 772.35 | 161.750 | 2.78 | 12.04 | 0.00 | 12.04 | 0.00 | Tunnel Outflow -1.04 MCM (12.04cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2659.30ft | 138.720 | 93.05% | 2661.20 | 143.990 | 9.20 | 12.32 | 0.00 | 12.32 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1593.90 | 39.690 | 72.47% | 1597.60 | 48.940 | 2.89 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1201.54 | 27.8161 | 55.82% | 1207.26 | 51.074 | 2.21 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 706.60 | 44.1972 | 93.24% | 706.65 | 44.360 | 20.35 | 20.35 | 0.00 | 20.35 | 2.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 753.56 | 22.900 | 67.39% | 752.64 | 21.07 | 19.10 | 9.97 | 0.00 | 9.97 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 972.85 | 9.32 | 29.92% | 978.75 | 17.76 | 7.70 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 417.30 | 13.70 | 45.21% | 420.05 | 19.88 | 32.83 | 42.09 | 0.00 | 42.09 | 0.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.45 | 7.240 | 94.64% | 1758.15 | 7.005 | 3.47 | 0.00 | 3.47 | 3.47 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.70 | 4.066 | 63.23% | 455.95 | 6.061 | 27.87 | 29.05 | 0.00 | 29.05 | 3.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.40 | 1.0915 | 20.63% | 747.60 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 249.20 | 2.978 | 65.45% | 252.00 | 4.120 | 58.09 | 55.38 | 0.00 | 55.38 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.50 | 0.415 | 35.78% | 190.65 | 0.892 | 28.26 | 26.41 | 0.00 | 26.41 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.50 | 0.2030 | 26.61% | 820.30 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.80 | 0.189 | 48.46% | 846.75 | 0.177 | 9.25 | 8.84 | 0.00 | 8.84 | 0.00 |