Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2399.31 ft | 2391.31 | 2397.31 | 2398.31 | 2351.96ft | 693.412 | 47.51% | 2386.20ft | 1178.812 | 49.21 | 10.55 | 0.00 | 10.55 | 36.60 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 167.00 | 165.50 | 166.00 | 166.50 | 154.82 | 627.963 | 61.70% | 162.81 | 839.385 | 21.91 | 4.84 | 0.00 | 4.84 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 979.84 | 977.84 | 978.84 | 979.34 | 972.64 | 312.820 | 70.06% | 977.02 | 372.490 | 24.51 | 7.96 | 0.00 | 7.96 | 2.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 771.70 | 154.750 | 76.99% | 772.20 | 160.150 | 7.18 | 11.81 | 0.00 | 11.81 | 0.00 | Tunnel Outflow -1.02 MCM (11.81cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2658.80ft | 137.370 | 92.14% | 2661.40 | 144.560 | 5.90 | 12.15 | 0.00 | 12.15 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1594.10 | 40.190 | 73.38% | 1597.90 | 49.690 | 2.89 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1201.69 | 28.2938 | 56.78% | 1207.27 | 51.126 | 2.58 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 706.35 | 43.5525 | 91.88% | 706.75 | 44.684 | 16.32 | 20.35 | 0.00 | 20.35 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 754.25 | 24.570 | 72.31% | 752.72 | 21.62 | 18.45 | 10.14 | 0.00 | 10.14 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 972.75 | 9.20 | 29.53% | 978.55 | 17.46 | 5.14 | 0.00 | 0.00 | 0.00 | 0.00 | Inflow not received | |
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 417.70 | 14.50 | 47.85% | 421.40 | 23.25 | 24.74 | 14.32 | 0.00 | 14.32 | 0.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.40 | 7.200 | 94.12% | 1758.10 | 6.970 | 3.01 | 0.00 | 3.47 | 3.47 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.65 | 4.602 | 71.57% | 455.95 | 6.061 | 34.61 | 24.27 | 0.00 | 24.27 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.20 | 1.0140 | 19.16% | 748.00 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 249.60 | 3.134 | 68.88% | 252.90 | 4.507 | 48.43 | 44.37 | 0.00 | 44.37 | 5.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.50 | 0.415 | 35.78% | 189.55 | 0.744 | 9.46 | 11.56 | 0.00 | 11.56 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.40 | 0.1993 | 26.12% | 820.40 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 847.00 | 0.236 | 60.51% | 846.80 | 0.189 | 8.42 | 8.00 | 0.00 | 8.00 | 0.00 |