Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2399.31 ft | 2391.31 | 2397.31 | 2398.31 | 2352.22ft | 696.607 | 47.73% | 2386.40ft | 1182.122 | 45.69 | 7.04 | 0.00 | 7.04 | 2.20 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 167.00 | 165.50 | 166.00 | 166.50 | 154.91 | 630.102 | 61.91% | 162.75 | 837.675 | 25.31 | 0.00 | 0.00 | 0.00 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 979.84 | 977.84 | 978.84 | 979.34 | 972.81 | 315.030 | 70.55% | 977.19 | 374.960 | 28.83 | 3.25 | 0.00 | 3.25 | 38.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 771.65 | 154.050 | 76.64% | 772.10 | 158.950 | 0.00 | 1.50 | 0.00 | 1.50 | 2.00 | Tunnel Outflow -0.13 MCM (1.5cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2659.00ft | 137.904 | 92.50% | 2661.40 | 144.560 | 16.13 | 9.95 | 0.00 | 9.95 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1594.20 | 40.440 | 73.84% | 1597.90 | 49.690 | 2.89 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1201.75 | 28.4849 | 57.16% | 1207.25 | 51.023 | 2.21 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 706.20 | 43.2045 | 91.15% | 706.80 | 44.846 | 16.32 | 20.35 | 0.00 | 20.35 | 6.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 754.38 | 24.840 | 73.10% | 753.25 | 22.29 | 5.84 | 2.66 | 0.00 | 2.66 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 972.90 | 9.38 | 30.11% | 978.65 | 17.61 | 6.46 | 0.00 | 0.00 | 0.00 | 3.00 | Inflow not received | |
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 418.10 | 15.32 | 50.56% | 421.35 | 23.13 | 18.99 | 9.56 | 0.00 | 9.56 | 8.20 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.40 | 7.200 | 94.12% | 1758.10 | 6.970 | 3.47 | 0.00 | 3.47 | 3.47 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.85 | 4.142 | 64.42% | 456.00 | 6.092 | 25.45 | 30.77 | 0.00 | 30.77 | 12.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.10 | 0.9752 | 18.43% | 747.50 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 249.90 | 3.251 | 71.45% | 251.00 | 3.700 | 56.46 | 55.10 | 0.00 | 55.10 | 2.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.00 | 0.365 | 31.47% | 188.70 | 0.646 | 9.25 | 8.31 | 0.00 | 8.31 | 60.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.40 | 0.1993 | 26.12% | 820.30 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.55 | 0.130 | 33.33% | 847.00 | 0.236 | 8.49 | 9.72 | 0.00 | 9.72 | 16.20 |