Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2399.31 ft | 2391.31 | 2397.31 | 2398.31 | 2353.98ft | 718.209 | 49.21% | 2386.70ft | 1187.088 | 118.97 | 9.44 | 0.00 | 9.44 | 15.20 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 167.00 | 165.50 | 166.00 | 166.50 | 155.24 | 637.942 | 62.68% | 162.51 | 830.835 | 31.16 | 6.08 | 0.00 | 6.08 | 1.80 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 979.84 | 977.84 | 978.84 | 979.34 | 973.12 | 319.060 | 71.46% | 977.38 | 377.800 | 19.21 | 5.67 | 0.00 | 5.67 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 771.70 | 154.750 | 76.99% | 771.90 | 156.350 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2659.60ft | 139.540 | 93.60% | 2660.90 | 143.150 | 20.70 | 14.41 | 0.00 | 14.41 | 6.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1594.40 | 40.940 | 74.75% | 1598.15 | 50.390 | 1.45 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1201.99 | 29.2492 | 58.70% | 1207.16 | 50.559 | 2.58 | 0.00 | 0.00 | 0.00 | 1.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 707.05 | 45.6579 | 96.32% | 706.60 | 44.197 | 38.11 | 15.96 | 5.24 | 21.20 | 9.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 754.17 | 24.310 | 71.54% | 753.71 | 23.20 | 1.63 | 6.78 | 0.00 | 6.78 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 973.20 | 9.74 | 31.27% | 978.20 | 16.93 | 5.10 | 0.00 | 0.00 | 0.00 | 18.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 419.35 | 18.13 | 59.83% | 420.00 | 19.75 | 24.16 | 12.78 | 0.00 | 12.78 | 4.80 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.40 | 7.200 | 94.12% | 1758.05 | 6.935 | 3.47 | 0.00 | 3.47 | 3.47 | 0.20 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.55 | 3.989 | 62.04% | 455.20 | 5.585 | 19.57 | 27.76 | 0.00 | 27.76 | 1.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 748.50 | 1.5177 | 28.68% | 747.10 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 249.90 | 3.251 | 71.45% | 247.20 | 2.231 | 77.92 | 89.47 | 0.00 | 89.47 | 2.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.50 | 0.415 | 35.78% | 188.10 | 0.580 | 7.55 | 8.34 | 0.00 | 8.34 | 12.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.50 | 0.2030 | 26.61% | 820.30 | 0.00 | Gate # 3 opened 10cm | ||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.55 | 0.130 | 33.33% | 846.65 | 0.154 | 8.26 | 9.49 | 0.00 | 9.49 | 3.00 |