Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2399.79 ft | 2391.79 | 2397.79 | 2398.79 | 2355.80ft | 740.575 | 50.74% | 2386.28ft | 1180.136 | 57.28 | 15.77 | 0.00 | 15.77 | 34.60 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 168.50 | 167.00 | 167.50 | 168.00 | 156.18 | 660.320 | 64.88% | 161.16 | 792.528 | 144.75 | 3.99 | 0.00 | 3.99 | 118.20 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 980.56 | 978.56 | 979.56 | 980.06 | 973.24 | 320.620 | 71.81% | 977.07 | 373.220 | 28.18 | 16.15 | 0.00 | 16.15 | 15.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 771.85 | 155.950 | 77.59% | 771.90 | 156.350 | 4.63 | 0.00 | 0.00 | 0.00 | 26.40 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2659.80ft | 140.080 | 93.96% | 2658.60 | 136.840 | 44.93 | 13.60 | 0.00 | 13.60 | 105.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1595.15 | 42.815 | 78.17% | 1598.55 | 51.590 | 5.79 | 0.00 | 0.00 | 0.00 | 63.60 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1203.04 | 32.5929 | 65.41% | 1207.17 | 50.611 | 18.06 | 0.00 | 0.00 | 0.00 | 112.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 707.30 | 46.3300 | 97.74% | 706.10 | 42.973 | 61.86 | 20.31 | 0.00 | 20.31 | 53.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 751.52 | 18.820 | 55.39% | 752.06 | 19.92 | 2.42 | 9.48 | 0.00 | 9.48 | 15.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 973.35 | 9.92 | 31.85% | 977.45 | 15.81 | 5.80 | 0.00 | 0.00 | 0.00 | 27.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 421.10 | 22.50 | 74.26% | 413.50 | 7.20 | 76.68 | 12.18 | 0.00 | 12.18 | 132.60 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.55 | 7.320 | 95.69% | 1758.15 | 7.005 | 3.47 | 0.00 | 3.47 | 3.47 | 49.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 455.05 | 5.490 | 85.38% | 452.80 | 4.117 | 43.85 | 29.15 | 0.00 | 29.15 | 42.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 748.00 | 1.3239 | 25.02% | 747.00 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 251.80 | 4.036 | 88.70% | 248.00 | 2.510 | 57.70 | 49.07 | 0.00 | 49.07 | 50.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 185.80 | 0.346 | 29.83% | 192.10 | 1.090 | 12.22 | 15.99 | 0.00 | 15.99 | 6.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.80 | 0.2144 | 28.10% | 820.40 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.70 | 0.165 | 42.31% | 846.60 | 0.142 | 7.19 | 6.64 | 0.00 | 6.64 | 15.50 |