Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2399.79 ft | 2391.79 | 2397.79 | 2398.79 | 2356.18 | 745.245 | 51.06% | 2386.22ft | 1179.143 | 59.90 | 4.17 | 0.00 | 4.17 | 13.20 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 168.50 | 167.00 | 167.50 | 168.00 | 156.36 | 664.640 | 65.30% | 161.05 | 664.640 | 50.58 | 0.00 | 0.00 | 0.00 | 6.40 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 980.56 | 978.56 | 979.56 | 980.06 | 973.32 | 321.660 | 72.04% | 977.04 | 372.780 | 17.71 | 5.67 | 0.00 | 5.67 | 1.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 771.85 | 155.950 | 77.59% | 771.90 | 156.350 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2659.90ft | 140.350 | 94.14% | 2658.70 | 137.110 | 17.92 | 14.77 | 0.00 | 14.77 | 10.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1595.30 | 43.390 | 79.22% | 1598.55 | 51.590 | 6.66 | 0.00 | 0.00 | 0.00 | 12.60 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1203.50 | 34.4167 | 69.07% | 1207.21 | 50.817 | 21.11 | 0.00 | 0.00 | 0.00 | 78.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 707.75 | 47.4000 | 100.00% | 706.25 | 43.321 | 92.35 | 20.32 | 59.65 | 79.97 | 25.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 751.61 | 19.000 | 55.92% | 751.82 | 19.43 | 3.34 | 1.23 | 0.00 | 1.23 | 1.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 973.35 | 9.92 | 31.85% | 977.40 | 15.73 | 3.47 | 0.00 | 0.00 | 0.00 | 3.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 420.70 | 21.50 | 70.96% | 413.65 | 7.42 | 36.41 | 47.98 | 0.00 | 47.98 | 6.40 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.55 | 7.320 | 95.69% | 1758.10 | 6.970 | 5.32 | 0.00 | 3.47 | 3.47 | 10.20 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 456.25 | 6.251 | 97.22% | 452.20 | 3.811 | 92.15 | 44.47 | 38.87 | 83.34 | 44.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.90 | 1.2852 | 24.29% | 747.00 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 253.00 | 4.550 | 100.00% | 248.50 | 2.705 | 135.52 | 95.78 | 33.80 | 129.58 | 53.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 185.70 | 0.336 | 28.97% | 189.70 | 0.761 | 7.47 | 7.52 | 0.00 | 7.52 | 5.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.70 | 0.2106 | 27.60% | 820.40 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.90 | 0.213 | 54.62% | 846.80 | 0.189 | 10.23 | 9.68 | 0.00 | 9.68 | 10.00 |