Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2400.03 ft | 2392.03 | 2398.03 | 2399.03 | 2358.12 | 769.059 | 52.69% | 2385.80ft | 1172.192 | 45.39 | 9.61 | 0.00 | 9.61 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 168.50 | 167.00 | 167.50 | 168.00 | 157.13 | 683.250 | 67.13% | 160.81 | 782.680 | 26.05 | 2.28 | 0.00 | 2.28 | 2.80 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.00 | 979.00 | 980.00 | 980.50 | 973.82 | 328.160 | 73.49% | 976.85 | 370.030 | 20.44 | 9.90 | 0.00 | 9.90 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 772.05 | 158.350 | 78.78% | 771.90 | 156.350 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2660.40ft | 141.740 | 95.07% | 2659.90 | 140.350 | 5.14 | 14.86 | 0.00 | 14.86 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1595.95 | 44.815 | 81.82% | 1598.50 | 51.440 | 6.69 | 5.25 | 0.00 | 5.25 | 14.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1204.68 | 39.5862 | 79.44% | 1207.17 | 50.611 | 6.59 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 706.70 | 44.5218 | 93.93% | 706.65 | 44.360 | 29.34 | 20.31 | 12.79 | 33.10 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 751.30 | 18.390 | 54.12% | 750.66 | 17.11 | 3.77 | 5.19 | 0.00 | 5.19 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 974.00 | 10.70 | 34.35% | 977.05 | 15.21 | 6.64 | 0.00 | 0.00 | 0.00 | 1.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 421.10 | 22.50 | 74.26% | 413.65 | 7.42 | 29.56 | 25.28 | 0.00 | 25.28 | 0.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.40 | 7.200 | 94.12% | 1758.15 | 7.005 | 3.70 | 0.00 | 4.63 | 4.63 | 20.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 455.85 | 5.997 | 93.27% | 452.50 | 3.964 | 42.97 | 44.37 | 1.88 | 46.26 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.20 | 1.0140 | 19.16% | 746.90 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 248.90 | 2.861 | 62.88% | 248.40 | 2.666 | 78.46 | 80.72 | 0.00 | 80.72 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.00 | 0.365 | 31.47% | 185.85 | 0.351 | 10.45 | 8.97 | 0.00 | 8.97 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.40 | 0.1993 | 26.12% | 820.30 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 847.05 | 0.248 | 63.59% | 847.10 | 0.260 | 9.31 | 8.49 | 0.00 | 8.49 | 0.00 |