Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2400.03 ft | 2392.03 | 2398.03 | 2399.03 | 2358.30 | 771.271 | 52.85% | 2385.70ft | 1170.537 | 35.22 | 7.96 | 0.00 | 7.96 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 168.50 | 167.00 | 167.50 | 168.00 | 157.20 | 685.000 | 67.30% | 160.85 | 783.800 | 21.34 | 0.42 | 0.00 | 0.42 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.00 | 979.00 | 980.00 | 980.50 | 973.89 | 329.070 | 73.70% | 976.80 | 369.300 | 16.92 | 6.39 | 0.00 | 6.39 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 772.10 | 158.950 | 79.08% | 771.90 | 156.350 | 6.94 | 0.00 | 0.00 | 0.00 | 0.00 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2660.20ft | 141.180 | 94.70% | 2660.20 | 141.180 | 5.55 | 12.04 | 0.00 | 12.04 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1596.00 | 44.940 | 82.05% | 1598.80 | 52.340 | 6.52 | 5.07 | 0.00 | 5.07 | 0.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1204.78 | 40.0243 | 80.32% | 1207.33 | 51.435 | 5.07 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 706.60 | 44.1972 | 93.24% | 706.90 | 45.171 | 28.36 | 20.31 | 11.81 | 32.12 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 751.27 | 18.330 | 53.94% | 750.66 | 17.11 | 2.71 | 3.41 | 0.00 | 3.41 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 974.05 | 10.76 | 34.54% | 976.95 | 15.06 | 6.35 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 421.45 | 23.38 | 77.16% | 414.20 | 8.25 | 22.49 | 12.36 | 0.00 | 12.36 | 0.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.35 | 7.160 | 93.59% | 1758.35 | 7.160 | 5.09 | 0.00 | 4.63 | 4.63 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 455.40 | 5.710 | 88.80% | 453.90 | 4.760 | 40.97 | 44.27 | 0.00 | 44.27 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.20 | 1.0140 | 19.16% | 746.70 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 249.20 | 2.980 | 65.49% | 249.40 | 3.060 | 67.34 | 65.99 | 0.00 | 65.99 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.20 | 0.385 | 33.19% | 186.80 | 0.446 | 7.17 | 9.04 | 0.00 | 9.04 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.40 | 0.1993 | 26.12% | 820.50 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 847.00 | 0.240 | 61.54% | 846.90 | 0.210 | 9.60 | 9.74 | 0.00 | 9.74 | 0.00 |