Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2364.18ft | 851.520 | 58.34% | 2381.30ft | 1097.697 | 27.96 | 12.85 | 0.00 | 12.85 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 158.54 | 719.580 | 70.70% | 159.91 | 757.480 | 21.03 | 7.88 | 0.00 | 7.88 | 2.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 976.28 | 361.760 | 81.02% | 976.03 | 358.220 | 24.10 | 14.03 | 0.00 | 14.03 | 7.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 771.60 | 153.350 | 76.29% | 770.65 | 142.350 | 9.26 | 0.00 | 0.00 | 0.00 | 3.80 | Tunnel Outflow – 0.00 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2660.90ft | 143.150 | 96.02% | 2658.70 | 137.110 | 18.16 | 14.92 | 0.00 | 14.92 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1595.90 | 44.690 | 81.60% | 1599.20 | 53.540 | 3.87 | 0.69 | 0.00 | 0.69 | 0.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1206.55 | 47.7786 | 95.88% | 1207.13 | 50.404 | 3.55 | 0.00 | 0.00 | 0.00 | 8.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 705.15 | 40.7689 | 86.01% | 705.40 | 41.349 | 22.08 | 18.05 | 0.00 | 18.05 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 752.25 | 20.280 | 59.68% | 753.98 | 23.85 | 3.36 | 6.89 | 0.00 | 6.89 | 4.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 976.40 | 14.23 | 45.68% | 976.15 | 13.86 | 5.74 | 0.00 | 0.00 | 0.00 | 6.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 421.90 | 24.50 | 80.86% | 416.10 | 11.30 | 17.59 | 16.14 | 0.00 | 16.14 | 0.00 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.30 | 7.120 | 93.07% | 1758.15 | 7.005 | 2.78 | 0.00 | 2.31 | 2.31 | 4.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.10 | 4.270 | 66.41% | 453.20 | 4.321 | 22.98 | 29.39 | 0.00 | 29.39 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.20 | 1.0140 | 19.16% | 746.90 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 248.60 | 2.744 | 60.31% | 249.40 | 3.056 | 40.58 | 42.38 | 0.00 | 42.38 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 187.50 | 0.518 | 44.66% | 188.50 | 0.623 | 12.66 | 12.28 | 0.00 | 12.28 | 3.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.40 | 0.1993 | 26.12% | 820.20 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.60 | 0.142 | 36.41% | 844.25 | shut down | 4.58 | 4.58 | 0.00 | 4.58 | 0.00 |