Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2364.28ft | 852.939 | 58.44% | 2381.22ft | 1096.373 | 26.03 | 7.63 | 0.00 | 7.63 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 158.58 | 720.660 | 70.81% | 159.95 | 758.600 | 13.23 | 0.00 | 0.00 | 0.00 | 19.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 976.33 | 362.490 | 81.18% | 976.02 | 358.080 | 20.20 | 11.75 | 0.00 | 11.75 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 771.60 | 153.350 | 76.29% | 770.65 | 142.350 | 0.00 | 0.00 | 0.00 | 0.00 | 12.80 | Tunnel Outflow – 0.00 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2661.00ft | 143.430 | 96.20% | 2658.90 | 137.640 | 16.17 | 12.93 | 0.00 | 12.93 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1596.00 | 44.940 | 82.05% | 1599.25 | 53.690 | 3.53 | 0.64 | 0.00 | 0.64 | 0.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1206.58 | 47.9101 | 96.15% | 1207.17 | 50.611 | 1.52 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 705.10 | 40.6529 | 85.77% | 705.25 | 41.001 | 16.65 | 17.99 | 0.00 | 17.99 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 752.16 | 20.100 | 59.15% | 753.95 | 23.77 | 1.71 | 3.82 | 0.00 | 3.82 | 19.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 976.45 | 14.31 | 45.94% | 976.10 | 13.78 | 5.64 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 422.15 | 25.12 | 82.90% | 416.15 | 11.40 | 10.69 | 3.45 | 0.00 | 3.45 | 0.00 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.25 | 7.080 | 92.55% | 1758.10 | 6.970 | 2.31 | 0.00 | 2.31 | 2.31 | 0.20 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.00 | 4.220 | 65.63% | 453.75 | 4.670 | 23.45 | 24.04 | 0.00 | 24.04 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.20 | 1.0140 | 19.16% | 746.90 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 249.70 | 3.170 | 69.67% | 248.40 | 2.670 | 46.77 | 41.81 | 0.00 | 41.81 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 185.80 | 0.346 | 29.83% | 185.00 | 0.271 | 8.90 | 9.60 | 0.00 | 9.60 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.40 | 0.1993 | 26.12% | 820.20 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.65 | 0.150 | 38.46% | 844.40 | shut down | 4.84 | 4.70 | 0.00 | 4.70 | 0.00 |