Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2365.52ft | 870.545 | 59.65% | 2373.46ft | 983.299 | 25.93 | 10.61 | 0.00 | 10.61 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 157.47 | 691.750 | 67.97% | 157.41 | 690.250 | 14.54 | 20.02 | 0.00 | 20.02 | 2.20 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 975.97 | 357.380 | 80.04% | 974.13 | 332.190 | 14.86 | 18.10 | 0.00 | 18.10 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 769.55 | 130.050 | 64.70% | 769.45 | 128.850 | 0.00 | 0.00 | 0.00 | 0.00 | 1.20 | Tunnel Outflow -0MCM (0Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2655.50ft | 128.800 | 86.39% | 2660.20ft | 141.180 | 5.28 | 11.11 | 0.00 | 11.11 | 2.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1597.70 | 48.390 | 88.35% | 1598.45 | 51.290 | 5.21 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.0 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1207.10 | 50.2499 | 100.84% | 1207.04 | 49.941 | 0.60 | 0.00 | 1.20 | 1.20 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 705.00 | 40.4209 | 85.28% | 703.55 | 37.236 | 28.95 | 10.16 | 0.00 | 10.16 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 754.44 | 24.990 | 73.54% | 750.42 | 16.62 | 0.00 | 5.51 | 0.00 | 5.51 | 6.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 976.00 | 13.63 | 43.76% | 974.20 | 10.94 | 1.71 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 421.40 | 23.25 | 76.73% | 415.40 | 10.11 | 4.06 | 9.85 | 0.00 | 9.85 | 0.00 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.25 | 7.080 | 92.55% | 1758.00 | 6.935 | 2.31 | 0.00 | 2.31 | 2.31 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.20 | 4.321 | 67.20% | 451.30 | 3.352 | 16.60 | 15.72 | 0.00 | 15.72 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.30 | 1.0140 | 19.16% | 746.90 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 250.40 | 3.454 | 75.91% | 244.20 | 1.396 | 24.63 | 23.68 | 0.00 | 23.68 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 185.60 | 0.327 | 28.19% | 186.00 | 0.365 | 13.33 | 17.69 | 0.00 | 17.69 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.40 | 0.1993 | 26.12% | 820.10 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.90 | 0.213 | 54.62% | 840.50 | shut down | 4.89 | 4.34 | 0.00 | 4.34 | 0.00 |