Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2365.52ft | 870.545 | 59.65% | 2373.18ft | 979.319 | 22.69 | 20.52 | 0.00 | 20.52 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 157.40 | 690.000 | 67.79% | 157.28 | 687.000 | 10.15 | 29.70 | 0.00 | 29.70 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 975.93 | 356.820 | 79.91% | 974.04 | 331.020 | 12.57 | 19.05 | 0.00 | 19.05 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 769.55 | 130.050 | 64.70% | 769.35 | 127.950 | 0.00 | 0.00 | 0.00 | 0.00 | 1.80 | Tunnel Outflow -0MCM (0Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2655.30ft | 128.300 | 86.06% | 2660.40ft | 141.750 | 7.47 | 13.30 | 0.00 | 13.30 | 5.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1597.75 | 49.415 | 90.22% | 1598.45 | 51.290 | 0.29 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.0 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1207.10 | 50.2499 | 100.84% | 1207.04 | 49.941 | 1.20 | 0.00 | 1.20 | 1.20 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 705.20 | 40.8848 | 86.25% | 703.75 | 37.634 | 15.53 | 10.16 | 0.00 | 10.16 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 754.04 | 24.000 | 70.63% | 750.57 | 16.93 | 1.59 | 13.07 | 0.00 | 13.07 | 13.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 976.00 | 13.63 | 43.76% | 974.10 | 10.82 | 3.04 | 0.00 | 0.00 | 0.00 | 3.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 421.25 | 22.88 | 75.51% | 415.40 | 10.11 | 8.33 | 12.62 | 0.00 | 12.62 | 0.00 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.30 | 7.120 | 93.07% | 1758.00 | 6.935 | 2.31 | 0.00 | 2.31 | 2.31 | 9.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.80 | 4.117 | 64.03% | 451.45 | 3.428 | 11.24 | 13.60 | 0.00 | 13.60 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.20 | 1.0140 | 19.16% | 746.90 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 250.50 | 3.495 | 76.81% | 247.20 | 2.262 | 26.32 | 25.84 | 0.00 | 25.84 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 185.70 | 0.336 | 28.97% | 185.30 | 0.308 | 16.53 | 15.20 | 0.00 | 15.20 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.40 | 0.1993 | 26.12% | 820.10 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.75 | 0.177 | 45.38% | 840.15 | shut down | 4.29 | 4.70 | 0.00 | 4.70 | 0.00 |