Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2350.72ft | 678.173 | 46.47% | 2346.88ft | 631.010 | 3.95 | 26.73 | 0.00 | 26.73 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 148.38 | 479.235 | 47.09% | 146.65 | 441.650 | 4.06 | 33.42 | 0.00 | 33.42 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 966.07 | 235.870 | 52.83% | 965.63 | 231.690 | 7.45 | 29.79 | 0.00 | 29.79 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 763.40 | 70.750 | 35.20% | 763.70 | 73.350 | 0.00 | 8.45 | 0.00 | 8.45 | 0.00 | Tunnel Outflow -0.73MCM (8.45 Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2626.40ft | 67.620 | 45.36% | 2650.80ft | 117.270 | 3.58 | 15.77 | 0.00 | 15.77 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1593.65 | 39.065 | 71.33% | 1594.65 | 41.565 | 1.23 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.356McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1204.60 | 39.2358 | 78.74% | 1204.37 | 38.228 | 2.95 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 1.0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 694.50 | 21.1783 | 44.68% | 700.00 | 30.178 | 7.29 | 9.22 | 0.00 | 9.22 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 754.44 | 24.990 | 73.54% | 751.36 | 18.510 | 8.56 | 14.72 | 0.00 | 14.72 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 966.15 | 2.34 | 7.51% | 965.75 | 2.010 | 1.06 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 416.30 | 11.70 | 38.61% | 412.75 | 6.110 | 12.21 | 12.21 | 0.00 | 12.21 | 0.00 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.15 | 7.005 | 91.57% | 1758.20 | 7.045 | 1.16 | 0.00 | 1.16 | 1.16 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.90 | 4.168 | 64.82% | 452.50 | 3.964 | 5.25 | 10.28 | 0.00 | 10.28 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.60 | 0.8110 | 15.33% | 746.40 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 249.70 | 3.173 | 69.74% | 249.00 | 2.900 | 15.64 | 16.54 | 0.00 | 16.54 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 185.70 | 0.336 | 28.97% | 185.80 | 0.346 | 23.13 | 23.11 | 0.00 | 23.11 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 819.70 | 0.1684 | 22.07% | 819.40 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.75 | 0.177 | 45.38% | shut down | 4.44 | 4.58 | 0.00 | 4.58 | 0.00 |