Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2350.62ft | 676.944 | 46.38% | 2346.56ft | 627.077 | 1.41 | 12.81 | 0.00 | 12.81 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 148.30 | 477.500 | 46.91% | 146.49 | 438.290 | 0.00 | 17.48 | 0.00 | 17.48 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 965.93 | 234.540 | 52.53% | 965.46 | 230.140 | 5.99 | 21.38 | 0.00 | 21.38 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 763.30 | 69.950 | 34.80% | 763.65 | 72.950 | 0.00 | 8.33 | 0.00 | 8.33 | 0.00 | Tunnel Outflow -0.72MCM (8.33 Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2625.90ft | 66.740 | 44.77% | 2650.40ft | 116.320 | 3.06 | 13.18 | 0.00 | 13.18 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1593.55 | 39.815 | 72.69% | 1594.65 | 41.565 | 1.74 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.4McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1204.39 | 38.3158 | 76.89% | 1204.19 | 37.440 | 0.93 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 1.0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 694.60 | 21.3455 | 45.03% | 699.95 | 30.079 | 10.82 | 8.88 | 0.00 | 8.88 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 754.44 | 24.990 | 73.54% | 751.49 | 18.760 | 10.79 | 10.79 | 0.00 | 10.79 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 966.05 | 2.25 | 7.22% | 965.60 | 1.890 | 2.44 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 416.30 | 11.70 | 38.61% | 412.95 | 6.380 | 11.02 | 11.02 | 0.00 | 11.02 | 0.00 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.15 | 7.005 | 91.57% | 1758.25 | 7.080 | 1.16 | 0.00 | 1.16 | 1.16 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.00 | 4.219 | 65.61% | 452.25 | 3.836 | 14.38 | 13.79 | 0.00 | 13.79 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.60 | 0.8110 | 15.33% | 746.40 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 250.40 | 3.454 | 75.91% | 250.00 | 3.290 | 14.24 | 10.99 | 0.00 | 10.99 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 185.10 | 0.283 | 24.40% | 186.15 | 0.380 | 15.30 | 16.94 | 0.00 | 16.94 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 819.70 | 0.1684 | 22.07% | 819.40 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.70 | 0.165 | 42.31% | shut down | 4.98 | 5.12 | 0.00 | 5.12 | 0.00 |