Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage w.r.t Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 17 | 18 | 19 | 20 | 21 | 22=20+21 | 23 | 24 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2377.95 ft | 2369.95 | 2375.95 | 2376.95 | 2340.64ft | 554.352 | 37.98% | 2322.28ft | 357.212 | 94.47 | 36.21 | 0.00 | 36.21 | 32.40 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 161.75 | 160.25 | 160.75 | 161.25 | 142.60 | 359.510 | 35.32% | 139.77 | 304.63 | 89.38 | 24.43 | 0.00 | 24.43 | 50.60 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 975.36 | 973.36 | 974.36 | 974.86 | 955.25 | 144.730 | 32.41% | 953.31 | 131.320 | 60.85 | 38.05 | 0.00 | 38.05 | 84.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 773.50 | 772.00 | 772.50 | 773.00 | 763.85 | 74.750 | 37.19% | 760.50 | 48.350 | 46.30 | 0.00 | 0.00 | 0.00 | 97.00 | Tunnel Outflow -0.00MCM (0.00 Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2604.80ft | 36.000 | 24.15% | 2626.80ft | 68.320 | 23.98 | 3.79 | 0.00 | 3.79 | 43.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1593.05 | 37.565 | 68.59% | 1585.45 | 22.465 | 1.45 | 0.00 | 0.00 | 0.00 | 21.00 | Sluice discharge/day -0 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1192.13 | 5.0574 | 10.15% | 1195.26 | 10.4858 | 1.41 | 0.00 | 0.00 | 0.00 | 8.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 691.00 | 15.5516 | 32.81% | 696.40 | 24.3549 | 17.53 | 16.62 | 0.00 | 16.62 | 38.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 748.59 | 13.120 | 38.61% | 750.81 | 17.420 | 39.98 | 19.00 | 0.00 | 19.00 | 190.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 965.50 | 1.81 | 5.81% | 965.45 | 1.77 | 28.07 | 0.00 | 0.00 | 0.00 | 96.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 419.15 | 17.62 | 58.15% | 420.20 | 20.25 | 48.84 | 51.74 | 0.00 | 51.74 | 40.00 | Vachumaram- 0.00 Mcm. | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1743.20 | 0.500 | 6.54% | 1751.35 | 3.220 | 0.58 | 0.00 | 0.00 | 0.00 | 15.00 | Sluice discharge/day – 0 | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.65 | 4.602 | 71.57% | 453.50 | 4.507 | 32.52 | 23.36 | 0.00 | 23.36 | 31.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.10 | 0.9752 | 18.43% | 747.00 | 0.9365 | 0.00 | ||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 247.00 | 2.200 | 48.35% | 248.70 | 2.783 | 41.79 | 42.86 | 0.00 | 42.86 | 35.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 188.70 | 0.646 | 55.69% | 186.20 | 0.385 | 31.00 | 32.66 | 0.00 | 32.66 | 88.00 | Gate No 2 closed at 3 p.m..on 05.07.24 | |||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.40 | 0.1993 | 26.12% | 820.10 | 0.1880 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.40 | 0.095 | 24.36% | 846.70 | 0.165 | 3.66 | 4.07 | 0.00 | 4.07 | 12.60 |